PLAZA Werksviertel Location City: Munich, Germany

A key part of a new up-and-coming district in Munich.
SPANNENDER MIXED-USE-KOMPLEX IM ZENTRUM DES NEUEN MÜNCHENER WERKSVIERTEL

VIEWS:  
Sectors:
Mixed Use, Retail, Residential, Leisure, Workplace, Hospitality
Services:
Architecture
Studios:
Düsseldorf
Client:
R&S Immobilienmanagement GmbH

Certifications:

Key Info

Includes:
Retail outlets, offices, a hotel, physio and sports facilities, a rock-climbing centre and an underground car-park
Area:
40,000 m² GBA
Status:
Opened November 2019
Umfasst:
Einzelhandel, Büro, Hotel, Extended-Stay-Hotel, Praxen, Fitnesscenter und eine Kletterhalle sowie eine Tiefgarage
Fläche:
40.000 m²
Status:
Fertigstellung 2019

Map Location

A new core for a new district

PLAZA Werksviertel is the central development in a new district in Munich, on a former industrial site within the inner ring. The Werksviertel district is conveniently located near to the Munich-East railway station, and is being transformed into a desirable urban residential, office and leisure area.

Herzstück und Impulsgeber des neuen Werksviertels in München

Im November 2019 wurde der Mixed-Use-Komplex PLAZA im Münchener Werksviertel eröffnet. Auf dem rund 39 Hektar großen ehemaligen Gewerbe- und Industrieareal in direkter Nachbarschaft zum Münchener Ostbahnhof wird in den kommenden Jahren ein urbanes Quartier entstehen, das Raum für eine Nutzungsmischung aus Wohnen, Arbeiten, Kultur- und Freizeiteinrichtungen, Schulen, Kindergärten und Einzelhandel bietet.

A multi-use scheme

Shopping occupies most of the ground floor, whilst separate buildings with various functions complete the block perimeter on the upper levels. The individual buildings are occupied by a hotel, extended-stay apartments, offices and a fitness and sports medicine building, over which a climbing centre cantilevers.

Ein multifunktionales Zentrum mit unterschiedlichsten Nutzungen entsteht

Diese lebendige Nutzungsmischung spiegelt sich auch im PLAZA wieder – über dem Nahversorgungszentrum im Erdgeschoss entwickeln sich vier separate Baukörper um einen intensiv begrünten Innenhof, der über eine großzügige Freitreppe erreichbar ist. Die einzelnen Baukörper gliedern sich in ein klassisches Moxy-Hotel, ein Residence-Inn Boarding House, ein Bürogebäude sowie ein Gebäude für Fitness und Gesundheit mit einer 6,5 m hohen auskragenden Boulderhalle als oberem Abschluss.

Chapman Taylor's Düsseldorf studio designed this mixed-use scheme as the central focus of the area's overall regeneration.

Chapman Taylor Düsseldorf ist verantwortlich für die Gestaltung und Planung dieses zentralen Bausteins des neuen Stadtviertels

First photo by Vincent Rieger <kontakt@vincentrieger.com>

Leenete Tazhicherry (Dipl -Ing Architektin BArch (Hons))

Associate Director, Düsseldorf

Among several major projects she has worked on in recent years, Leenete developed the detailed design for the façade at Plaza Grafinger Strasse in Munich, subsequently leading project teams on the new-build shopping centre Salzach Forum in Burghausen and the revitalisation of Krohnstieg Centre in Hamburg.

Leenete studied at Newcastle University in the UK and at RWTH Aachen University in Germany, graduating in 2005 and 2007 respectively, before beginning her career in London, where she gained extensive experience in the residential sector. She led design teams on construction and delivery projects before joining Chapman Taylor’s Düsseldorf studio in 2015.

She has also been a key figure in rolling out revised CAD standards within the Düsseldorf studio and helping to streamline data structures.

Areas of Expertise:

Residential / Retail / Design Development / Construction / Delivery


Leenete hat an der Newcastle University in Großbritannien und an der RWTH Aachen in Deutschland studiert. Nachdem sie ihr Studium im Jahr 2005 bzw. 2007 erfolgreich abgeschlossen hatte, begann sie ihre Karriere in London, wo sie weitreichende Erfahrung im Bereich Wohnungsbau sammeln konnte. Sie leitete Entwurfsteams in der Ausführungsplanung, bevor sie 2015 zu Chapman Taylor in Düsseldorf kam.

Leenete entwickelte die Detailplanung für die Fassade des Plaza Grafinger Strasse in München und leitete danach Projektteams für den Neubau des Einkaufszentrums Salzach Forum in Burghausen und die Revitalisierung des Krohnstiegzentrums in Hamburg.

Sie hatte zudem eine Schlüsselrolle in der Entwicklung neuer CAD-Standards und der Rationalisierung der Datenstrukturen im Düsseldorfer Büro.

Seit 2018 ist sie Associate Director in unserem Düsseldorfer Büro.

Schwerpunkte:

Wohnungsbau / Einzelhandel / Entwurfsplanung/ Ausführungsplanung

caret-down-skewed caret-down-thin caret-down caret-left-thick caret-left-white caret-left caret-right-thick caret-right-white caret-right caret-up chinese cross download english facebook grid instagram linked-in list mail map pinterest play-button reset search-nobg search-square share twitter views wechat youtube