MediaCity Phase 2 Location City: Manchester, UK

MediaCityUK set to double in size with £1bn expansion.

VIEWS:  19836
Sectors:
Masterplanning, Mixed Use, Residential, Leisure, Workplace
Services:
Architecture
Studios:
Manchester
Client:
Peel Media Ltd / L&G Capital

Certifications:

Key Info

Includes:
Ten new development plots totalling 210,000m² and provides; 1,800 residential units; 50,000m² office space; restaurants; new public square pocket park and associated public realm
Area:
7.7 hectares / 211,000m² GEA
Status:
Detailed Planning Consent granted Oct 2016
Sustainability:
All 10 buildings target BREEAM ‘Excellent’ ratings
Key award:
‘Planning Permission of the Year 2017’ at the UK Planning Awards 2017

Map Location

​Doubling in size

"Technology and media is a rapidly growing sector in Manchester, which is now considered the second largest creative and digital hub in Europe. MediaCity has been a key trigger in the explosion of creative start-ups and national relocations”.

Against this background, the £1 billion, 211,000m², second phase of MediaCity gained planning consent in September 2016 and triggered the start of the next step on the journey of establishing MediaCity into a sustainable mixed-use community.

​Doubling in ambition

Already home to the BBC, ITV, University of Salford and over 250 creative media businesses, MediaCity is a major digital media hub, centre of learning and established visitor destination.

A mix of new office, retail and leisure uses with a substantial residential component

Our Phase 2 design scheme included a major residential component, comprising 1,800 private sale and build-to-rent city apartments and town houses. It also included over 55,000m² of additional office space, retail and leisure uses, as well as a sequence of new public spaces.

Co-ordination of several designers using BIM

We coordinated multiple architects, many using different software packages, throughout the design development process. All project outputs were driven from BIM models that Chapman Taylor created, including planning drawings, area schedules, 3D views and other elements.

Chapman Taylor’s role on Phase 2 included the development of the overall masterplan and individual plot briefs, coordinating the work of six other architects on ten plots and also designing three of the buildings.

Awards

Planning Permission of the Year 2017 - Planning Magazine
Planning Permission of the Year 2017 - Planning Magazine
All awards
caret-down-skewed caret-down-thin caret-down caret-left-thick caret-left-white caret-left caret-right-thick caret-right-white caret-right caret-up chinese cross download english facebook grid instagram linked-in list mail map pinterest play-button reset search-nobg search-square share twitter views wechat youtube