Chapman Taylor completes contemporary Cat A+ fit-out at 5 Callaghan Square, Cardiff

Chapman Taylor has completed the transformation of an open-plan office suite at 5 Callaghan Square, Cardiff, into a vibrant, contemporary Cat A+ workplace designed to re-energise one of the city’s most prominent business addresses.

The 954m² (10,268ft²) space has been reimagined as a flexible show suite, demonstrating how creative and sustainable design can breathe new life into existing office environments. The refurbishment showcases how the entire floorplate can be adapted to future tenants’ needs, offering an inspiring, ready-to-use workplace that balances flexibility with character.

The design replaces the former maze of partitions with a light-filled, inclusive and adaptable environment that celebrates openness and collaboration. The arrival space dispenses with the formality of a traditional reception desk, instead offering a hospitality-inspired welcome area. Carefully defined zones provide spaces for meetings, focused work and social interaction, while a central teapoint acts as the social heart of the suite.

Sustainability was integral to the approach. The project reuses the existing structure and raised access floors, removes unnecessary suspended ceilings to improve daylight and spatial quality, and uses durable, renewable and recyclable materials such as Foresso wood-chip worktops. New energy-efficient lighting and adaptable layouts further enhance environmental performance and reduce future waste.

The Cat A+ fit-out has significantly enhanced the building’s market presence, allowing prospective tenants to easily envision their own identity within the space. Since completion, the scheme has attracted strong interest and has been described by the client as “the best in the Cardiff market.”

Chapman Taylor delivered the architectural design in collaboration with PAC 11 Ltd (Developer), Beacons Business Interiors Ltd (Contractor), Watts Group Limited (Engineer), and Wells Senior (Project Manager).

Completed in September 2025, 5 Callaghan Square sets a new benchmark for adaptable, people-centred workplaces in Cardiff’s commercial landscape.

Mark Doughty (BA (Hons) BArch)

Director, 曼彻斯特

Mark joined Chapman Taylor in 2006 becoming an Associate Director in 2016. A key member of the Manchester studio’s management team, Mark has a business development remit for the office workplace sector across the UK business.

He has over 10 years’ experience and has successfully completed a number of major award winning projects across a range of sectors.

He takes an active part in the BCO and completed last year’s Cycle Challenge riding from London to Amsterdam over four days with fifty members of the BCO.

Areas of expertise:

Office / Retail / Delivery / Design Management

Mark joined Chapman Taylor in 2006 becoming an Associate Director in 2016. A key member of the Manchester studio’s management team, Mark has a business development remit for the office workplace sector across the UK business.

He has over 10 years’ experience and has successfully completed a number of major award winning projects across a range of sectors.

He takes an active part in the BCO and completed last year’s Cycle Challenge riding from London to Amsterdam over four days with fifty members of the BCO.

Areas of expertise:

Office / Retail / Delivery / Design Management

Gavin King

Director, 曼彻斯特

相关项目

所有项目
caret-down-skewed caret-down-thin caret-down caret-left-thick caret-left-white caret-left caret-right-thick caret-right-white caret-right caret-up chinese cross download english facebook grid instagram linked-in list mail map pinterest play-button reset search-nobg search-square share twitter views wechat youtube