Mirabad Avenue Location City: Tashkent, Uzbekistan

Sectors:
Mixed Use, Retail, Residential
Services:
Masterplanning, Architecture
Studios:
Moscow
Client:
Golden House

Certifications:

A striking new urban quarter for Taskhent.

Map Location

Key Info

Includes:
Four blocks of luxury residential properties with retail and F&B units at street-level
Area:
2.4 hectares
Status:
Expected to complete in early 2020.

A new residential-led urban quarter

The 2.4 hectare Mirabad Avenue project represents a new type of residential-led, mixed-use development in the Uzbek city of Tashkent. Creating a striking new urban quarter, the development regenerates this entire area of the city. Discreet quarters with communal courtyard gardens will offer residents a sense of private space in a busy urban environment. The varying types of apartment will mostly face the internal courtyards, away from the street’s noise.

Luxury residential properties

The development site has a long, prime frontage on Mirabad Street, which links two main routes between the city centre and airport. The concept for this residential development is a group of four blocks, each comprising luxury residential properties, efficiently arranged around private courtyard. Each block is completed with corner feature towers containing penthouses at the top. The development at street level is fully dedicated to Retail and F&B.

Chapman Taylor has created the concept and scheme design for this prominent urban residential scheme on behalf of Golden House, working alongside CDI Building Services Engineers.

'Smart' building design scheme

The scheme will incorporate ‘smart’ building – residential buildings will be designed to maximise environmental, technical and economic efficiency. Residents’ comfort is prioritised, with digital technology incorporated to reduce the need for manual operation of services as well as allowing residents to manage their apartments from anywhere in the world.

Attractive and safe

Architectural style follows that of the surrounding area, with five 12-storey towers acting as punctuation between the main nine-storey buildings, all served by two levels of underground car parking. Roadways, paths and public realm spaces are uncluttered, attractive and safe for residents and visitors alike.

The Mirabad Avenue development is expected to be fully completed by early 2020.

Ramchandra Khatiwada (MSc(Arch) RIBA)

Director, Moscow

Ramchandra (Ram) joined Chapman Taylor in 1999. He was appointed as the Director responsible for our Russian business in 2006 and played a key role in opening our Moscow studio in 2007.

A fluent Russian speaker with excellent knowledge of the Russian design and planning system, Ram has worked on large-scale retail and mixed-use schemes in Russia, Kazakhstan, and other CIS countries.

Areas of expertise:

Retail / Mixed-use / Transportation

Рамчандра (Рам) стал частью команды Chapman Taylor в 1999 году. В 2006 году он был назначен на должность директора, ответственного за развитие бизнеса на российском рынке. В 2007 году Рам сыграл ключевую роль в открытии офиса компании в Москве.

Рам свободно говорит на русском языке и отлично знаком с особенностями российского проектирования и системы планирования. На протяжении многих лет Рам успешно реализует широкомасштабные проекты торговых объектов и многофункциональных комплексов в России, Казахстане и других странах СНГ.

Область специализации:

Проектирование торговых объектов/многофункциональных комплексов/ транспортных систем

caret-down-skewed caret-down-thin caret-down caret-left-thick caret-left-white caret-left caret-right-thick caret-right-white caret-right caret-up chinese cross download english facebook grid instagram linked-in list mail map pinterest play-button reset search-nobg search-square share twitter views wechat youtube