Drone footage of PINEA Resort Phase 1 approaching completion in Pobierowo, Poland

New drone footage shows Phase 1 of the PINEA Resort development edging towards completion in the Baltic city of Pobierowo, Poland.

The building’s façade has been completed and finishing touches are being made to the interiors, while landscaping work is now well under way.

The 55,000m2 GBA PINEA Resort complex consists of three main buildings containing 175 private apartments, a 156-key, 4-Star Hilton Garden Inn hotel and a 150-room condo-hotel with an associated spa, swimming pool, physio rooms, saunas and sports facilities (c.1,000m2). Additionally, there are shared underground car parking and servicing zones.

The signature saw-tooth external architecture of the buildings will ensure that all rooms have stunning views of the Baltic Sea while offering privacy to residents and guests using the balconies and terraces.

All the buildings will be modern and sustainable, with high-efficiency MEP systems and a rainwater collection and storage system for use on the scheme’s plants and green spaces. In addition, there are cooling units located on the technical roof, located just below the green one.

The buildings’ green roofs have been designed to achieve a high bioactive green area ratio (60%), as required by the local development plan. The resort design also prioritised the protection of the area’s biodiversity and the existing costal landscape habitat, helping to lower the buildings’ energy use.

The project was designed using advanced BIM-based design tools, including a point-cloud-based topographical survey – allowing us to create a collaborative architectural and structural BIM model alongside separate MEP models. With Phase 1 (the private apartments) being built, construction documentation is currently being produced for Phase 2.

Chapman Taylor designed PINEA Resort for Fenixco, a joint venture of Belgian and Polish investors, with Strabag Construction acting as general contractor on Phase 1. The first building will be opened in the fourth quarter of 2021.

Witold Nowakowski

Associate Director, Warsaw

Witold is responsible for overseeing implementation of our BIM strategy at our Warsaw studio and is an RICS-qualified BIM Manager.

He joined Chapman Taylor’s Warsaw studio in 2008 and became an Associate Director in 2011. He has an established track record in the design of major retail, hospitality and residential projects in Poland.

Witold has also undertaken the BREEAM Assessors' training course and is a BREEAM International Assessor. He speaks Polish, English, French and Russian.

Area of Expertise:

Building Information Modelling / Design Management / Workplace / Residential / Sustainability

caret-down-skewed caret-down-thin caret-down caret-left-thick caret-left-white caret-left caret-right-thick caret-right-white caret-right caret-up chinese cross download english facebook grid instagram linked-in list mail map pinterest play-button reset search-nobg search-square share twitter views wechat youtube