Ganjlik Mall Location City: Baku, Azerbaijan

Sectors:
Retail, Leisure
Services:
Architecture, Interiors
Studios:
London, Prague
Client:
Pasha Construction

Certifications:

Azerbaijan’s largest shopping centre

Map Location

Key Info

Includes:
A new retail and leisure destination, a mix of international and local retail brands, a range of restaurants and cafés, a mulitiplex cinema, bowling and family entertainment offers
Area:
50,000m² NLA, 121.500m² GBA
Number of Floors:
4
Completed:
April 2016

A mall designed to appeal to a broad range of consumers

Azerbaijan’s largest shopping centre, Ganjlik Mall is a retail and leisure destination arranged around a dramatic four storey central atrium that floods all areas of the mall with daylight.

Appealing to a broad customer base, the mall is well located, north of the city centre, adjacent to the Tofiq Bahramov Football Stadium, with direct access from the busy Ganjlik metro and bus stations.

Innovative façade, canopy and lighting design

The façade of this 50,000m² shopping and leisure destination on Fatali Khan Khoyski Boulevard is finished in an interlocking composition of warm sandstone cladding and cool glass, with limestone ‘bookends’ framing the corner entrances. An elegant, wing-shaped canopy unifies all the elements of the main elevation. 

An innovative lighting scheme including parametrically controlled external lighting linked to wind speed and direction monitors has been developed by Lighting Design Collective.

Family entertainment centre

A multiplex cinema, bowling and family entertainment centre complete the leisure offer.  

External cafés and terraces offer city views

Among the mix of international and local retail brands is a range of cafés and restaurants on the upper level, with external terraces offering city views. 

Interior features that enhance the customer experience

Feature chandeliers of handmade Czech glass by Lasvit are suspended within the double height entry spaces. 

Chapman Taylor, as lead design architect, was involved in the project from the beginning in January 2013, taking it from early concept stage, through execution drawings packages right up to completion and opening. A local site-based team was set up to oversee construction.

For more information please contact:

Jon Hale
Director (CEE)
T: 00420 22421 4121
Ejhale@chapmantaylor.com

caret-down-skewed caret-down-thin caret-down caret-left-thick caret-left-white caret-left caret-right-thick caret-right-white caret-right caret-up chinese cross download english facebook grid linked-in list mail map pinterest play-button reset search-nobg search-square share twitter views wechat youtube